
Division 02
Infrastructure Equipment, Supplied with the Tender File
Infrastructure contractors, utilities, and municipal and ministry-tier project operators. The fear here is rarely the machine. It is the file — equipment that performs while the paperwork fails an audit, a tender submission rejected over a missing certificate of conformity.
This division is built for projects that get inspected. We assemble the documentation pack as part of the order rather than as a favour afterwards, and we tell you at quotation stage which certificates a given origin can and cannot produce.
Equipment for water, road and utility works, supplied with the origin, conformity and technical documentation that tender files and project audits require.

Published before you order, so you can check it against your tender file rather than discover the gap at submission. If a document your file needs is not on the list, say so at quotation and we will source against it or tell you plainly that we cannot.
Water and sanitation
- Submersible, booster and dewatering pump sets
- Valves, penstocks and flow meters
- Chlorination and dosing units
- Trenchers and pipe handling equipment
- Blowers, mixers and screening equipment
Roads and bridges
- Mobile crushers and screens
- Piling rigs and augers
- Dewatering and grouting plant
- Road lighting, high-mast poles and LV pillars
- Traffic signalling power supplies
Utility networks
- Cable pulling winches and drum trailers
- Pole erection and line stringing equipment
- Ring main units and pad-mount substations
- Earthing and lightning protection materials
Control and telemetry
- Motor control centres and variable frequency drives
- Instrumentation: flow, level, pressure, chlorine
- RTUs and SCADA panels
- Control room UPS and battery backup

- 01Documentation pack contents list
- Published before you order, so you can check it against your tender file rather than discover the gap at submission. If a document your file needs is not on the list, say so at quotation and we will source against it or tell you plainly that we cannot.
- 02Customs clearance workflow
- The written sequence from port of entry to site, with the party responsible at each step. We hold the file. You are not the one chasing a broker for a stamped copy.
- 03Certificate of conformity sample
- A real example of the conformity and origin documents supplied with this category, so your project engineer can confirm the format works for the audit before any money moves.